Five-Year Cumulative Cost Saving with Thrombolysis in Korea: 3-Month Disability-Based Estimation

J Stroke. 2020 May;22(2):262-265. doi: 10.5853/jos.2020.00556. Epub 2020 May 31.
No abstract available